Construction Site: | Power Plant Walsum, Block 10 |
Period: | 07/10 - 09/10 |
Work: | Boiler wall renovation |
Materials: | 7CrMoVTiB10-10; NiCr23Fe |
Staff: | average 20 Employee |
Construction Site: | Power Plant Walsum, Block 10 |
Period: | 07/10 - 09/10 |
Work: | Boiler wall renovation |
Materials: | 7CrMoVTiB10-10; NiCr23Fe |
Staff: | average 20 Employee |
FERNGAL Schweißtechnik GmbH
ChemiePark Bitterfeld-Wolfen
Areal A
Liebigstraße 2
06766 Bitterfeld-Wolfen
Tel.: +49(0)3494 72008-0
Fax: +49(0)3494 72008-29
This email address is being protected from spambots. You need JavaScript enabled to view it.